How can i order a clock block (or other linea block) to start at a specified time in simulink?
11 visualizzazioni (ultimi 30 giorni)
Mostra commenti meno recenti
Hi guys I have a model with two different timelines. I defined these timelines with two clock blocks. Both blocks would start at simulation start time. I want one of them to start at a different time. What can I do?
I tried both enable and trigger subsystems both nothing happened.
0 Commenti
Risposta accettata
A Jenkins
il 1 Lug 2014
2 Commenti
A Jenkins
il 1 Lug 2014
Modificato: A Jenkins
il 1 Lug 2014
Build your own Ramp with an Integrator Block? This gives the same answer as above. It uses the external reset = 'level' for the integrator to hold it off until the condition becomes true.
(Another option is to recreate the ramp block. Just right-click on it and select "Mask->Look Under Mask" to see how it works.)
Più risposte (0)
Vedere anche
Categorie
Scopri di più su Sources in Help Center e File Exchange
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!