Sum(sum()) with optimization variable
27 visualizzazioni (ultimi 30 giorni)
Mostra commenti meno recenti
I want to write the following equation as a constraint
and x is an optimization variable.
I managed to get to following formulation
Constraint2 = sum(sum(x,3),1) <= ones(1,nRess)
Now the problem is, that I do not know how to change the running boundries of the inner sum, to the above given form (so not all the elements of the dimension 3, but only starting from l=t-pt_jr to t, and also while l>0).
pt_jr is a 2D matrix.
I tried to write it with sum(sum()) as I read about vectorization and didn't want to generate too long working times wir for loops.
Thanks ahead for any ideas.
1 Commento
Walter Roberson
il 15 Ago 2022
What if you multiply x by a logical condition ? That would zero out some locations, and that would add nothing to the sum.
Risposte (2)
Jan
il 15 Ago 2022
Modificato: Jan
il 15 Ago 2022
Constraint2 = sum(x(:, :, (t - pt(j, r)):t), [1, 3]) <= 1;
6 Commenti
Jan
il 18 Ago 2022
nTasks = 3;
nRess = 2;
maxPT = 50;
x = optimvar('x',nTasks,nRess,maxPT,'Type', 'integer','LowerBound',0,'UpperBound',1);
x is not an array we can sum over. While I was talking about an array, the introduction of optimvar() was out of my view. I have no idea, what the realtion between the question and this code is.
Bruno Luong
il 15 Ago 2022
What about this:
L = reshape(1:size(x,3),1,1,[])
b = L >= t-pt_rj & L <= t;
Constraint2 = sum(sum(b.*x,3),1) <= ones(1,size(x,2))
4 Commenti
Bruno Luong
il 18 Ago 2022
I'm lost, it sounds like you are stuck with how to transforming whatever the scheduling problem you want to solve in math formulation, and not transforming math into matlab.
If that is the case I won't be able to help you, for the simple reason is that I don't understand what you wrote in the description.
Vedere anche
Categorie
Scopri di più su Logical in Help Center e File Exchange
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!