Azzera filtri
Azzera filtri

Flow chart runs only once ?

3 visualizzazioni (ultimi 30 giorni)
Xiaohong shen
Xiaohong shen il 13 Giu 2023
Newly I realized the flow chart in the state1 is excuted only one time at state entry. Actually I expected the cnt shall be counted up every loop as long as the state1 is active.
How can I fix it so that the flow chart is called every loop?
I found also the following note. It would mean the observed behavior is intended?
If a Stateflow chart contains only a flow chart, the chart evaluates the flow chart each time the chart wakes up. In contrast, the chart evaluates any flow chart inside a state only during state entry.

Risposte (0)

Categorie

Scopri di più su Simulink Functions in Help Center e File Exchange

Prodotti


Release

R2022a

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by