Hi,
I have a program that (for what I've done so far) takes a long time to run (~4s per loop). In the final version of the code I will be performing hundreds of loops. Would it be quicker if I assigned parts of the code as functions, or would this actually increase the run time?
Thanks
Richard
0 Commenti
Risposta accettata
Walter Roberson
il 6 Apr 2011
It is difficult to predict exactly how MATLAB will optimize code. Especially before 2010b, the details how how the code was written in the file could make a substantial difference. This is one of those "You'd have to try it and see" matters.
Have you used the profiler to track down the portion of your code that is taking a lot of time?
Più risposte (1)
Jason Ross
il 6 Apr 2011
Have you looked into using functions from the Parallel Computing Toolbox (parfor, spmd, etc)?
Of course, not knowing your problem, you may have conditions that prevent the use of these functions.
0 Commenti
Vedere anche
Categorie
Scopri di più su Data Type Identification in Help Center e File Exchange
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!