Al momento, stai seguendo questo contributo
- Vedrai gli aggiornamenti nel tuo feed del contenuto seguito
- Potresti ricevere delle email a seconda delle tue preferenze per le comunicazioni
The code simulates a wireless ad-hoc network, considering the effects of transmission delay, queueing delay, and propagation delay on packet transmission between nodes. The code sets parameters for the simulation, creates random node positions within an area, and calculates distance, adjacency, and delay matrices. It then simulates packet transmission between nodes, computes delays, and visualizes the network and delays between nodes on a graph.
Cita come
Ardavan Rahimian (2026). Wireless Ad-hoc Network Delay Analysis and Visualization (https://it.mathworks.com/matlabcentral/fileexchange/128854-wireless-ad-hoc-network-delay-analysis-and-visualization), MATLAB Central File Exchange. Recuperato .
Informazioni generali
- Versione 1.0 (1,94 KB)
Compatibilità della release di MATLAB
- Compatibile con qualsiasi release
Compatibilità della piattaforma
- Windows
- macOS
- Linux
| Versione | Pubblicato | Note della release | Action |
|---|---|---|---|
| 1.0 |
