photo

ragavendiran appavoo


Last seen: 6 mesi fa Attivo dal 2021

Followers: 1   Following: 0

Statistica

File Exchange

3 File

RANK
N/A
of 301.472

REPUTAZIONE
N/A

CONTRIBUTI
0 Domande
0 Risposte

ACCETTAZIONE DELLE RISPOSTE
0.00%

VOTI RICEVUTI
0

RANK
6.871 of 21.293

REPUTAZIONE
157

VALUTAZIONE MEDIA
3.00

CONTRIBUTI
3 File

DOWNLOAD
18

ALL TIME DOWNLOAD
1528

RANK

of 174.655

CONTRIBUTI
0 Problemi
0 Soluzioni

PUNTEGGIO
0

NUMERO DI BADGE
0

CONTRIBUTI
0 Post

CONTRIBUTI
0 Pubblico Canali

VALUTAZIONE MEDIA

CONTRIBUTI
0 Punti principali

NUMERO MEDIO DI LIKE

  • 5-Star Galaxy Level 1
  • Personal Best Downloads Level 2
  • First Submission
  • Explorer

Visualizza badge

Feeds

Visto da

Inviato


IEEE 13 bus system with DVR
DVR with fault and without fault using RLS algorithm

circa 5 anni fa | 9 download |

0.0 / 5

Inviato


3 Machine 9 Bus system with DPFC
FACTS device which is the DPFC on the critical clearing fault time in multi-machine power system

circa 5 anni fa | 2 download |

1.0 / 5

Inviato


Three machine nine bus system with Power system stabilizer
a 3 machine 9 bus system is considered and in turbines and regulator block we used power system stabilizers to add damping to th...

circa 5 anni fa | 6 download |

0.0 / 5