Terribly slow simulation // NN Predictive Controler.

Hello.
I happen to have some problems with simulations of systems with NN Predictive Controler.
At first, I thought the XY Graph was a problem, but I removed it so I could write the data directly to the workspace from simulations using both NARMA-L2 controler and Predictive controler, and now simulations with NARMA-L2 are done instantly, while the ones with Predictive controler take more than 1 hour (!) for simulation time 50. What is wrong?
Looking forward to any help from you guys.

Risposte (0)

Categorie

Scopri di più su Model Predictive Control Toolbox in Centro assistenza e File Exchange

Richiesto:

Mat
il 10 Gen 2014

Modificato:

Mat
il 10 Gen 2014

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by