Info

Questa domanda è chiusa. Riaprila per modificarla o per rispondere.

Controlling the NextHitValue in a large simulink file

1 visualizzazione (ultimi 30 giorni)
Anfänger
Anfänger il 14 Apr 2014
Chiuso: MATLAB Answer Bot il 20 Ago 2021
Is there a way to control the simulation step in simulink? I am having a large file, where each block is user defined Matlab Level2 S-function. Within each block, I have implemented a necessary condition for stability, which enables me to get the maximum time step for which the current block will be stable. This means, that for the complet file, I have to take the smallest time step from all blocks and set iteratively, the NextHitValue of the individual blocks to this value. How can I do that without using global variable?

Risposte (0)

Prodotti

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by