How can I do a Monte Carlo simulation for 1000 runs on this operation?

4 visualizzazioni (ultimi 30 giorni)
Please can someone help to verify that this is the proper way to run a monte carlo simulation on this code?
% A = T(:,1); %Column vector
A = [71.213; 74.499; 79.175; 54.163; 83.008; 52.615];
B = length(A); %size of column (number of elements)
t = 0; %Variable to store harvest time
number_of_runs = 1000;
for n = 1:number_of_runs
for i = 1:B
H = A(i);
while H > 0
H = H - randi([5 10]);
t = t + randi([2 4]);
end
end
end
t_mean = t/number_of_runs;
disp(t_mean);
  2 Commenti
John D'Errico
John D'Errico il 8 Mar 2023
Modificato: John D'Errico il 9 Mar 2023
Hard to say. That is the proper way to simulate what you simulated. Is it the proper way to simulate what you think you were simulating? That is impossible to tell, since we see only the code you wrote. So perhaps you need to explain what is the goal.

Accedi per commentare.

Risposta accettata

Torsten
Torsten il 9 Mar 2023
Maybe you mean:
% A = T(:,1); %Column vector
A = [71.213; 74.499; 79.175; 54.163; 83.008; 52.615];
B = length(A); %size of column (number of elements)
number_of_runs = 1000;
T = zeros(number_of_runs,1); %Variable to store harvest time
for n = 1:number_of_runs
t = 0;
for i = 1:B
H = A(i);
while H > 0
H = H - randi([5 10]);
t = t + randi([2 4]);
end
end
T(n) = t;
end
plot(1:number_of_runs,T)
t_mean = sum(T)/number_of_runs;
disp(t_mean);
175.9570

Più risposte (0)

Categorie

Scopri di più su Monte-Carlo in Help Center e File Exchange

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by