- Building a large-scale electrical grid in Simscape Electrical: https://www.mathworks.com/support/search.html/videos/from-desktop-to-real-time-simulation-for-electrical-grids-1572373802239.html?fq%5B%5D=asset_type_name:video&fq%5B%5D=category:sps/index&page=1
- IEEE 39-Bus System: https://www.mathworks.com/help/sps/ug/ieee-39-bus-system.html
Issue with 5 MW Grid Model in Simscape — Power Not Increasing Beyond Certain Load
3 visualizzazioni (ultimi 30 giorni)
Mostra commenti meno recenti
I am currently working on modeling an electrical grid using MATLAB/Simulink Simscape. The goal is to create a grid capable of handling a 5 MW load.
The grid side of the model is configured as follows:
✅ a 3-phase grid (33 kV, 50 Hz, X/R = 10)
✅ followed by a transformer (33 kV → 690 V, 50 Hz)
✅ and an LCL filter
However, I’m facing an issue: when I increase the load beyond a certain level, the power delivered does not increase as expected — it seems to be limited somewhere in the model. I suspect this might be due to constraints or incorrect parameters in the source, transformer, or LCL filter, but I haven’t been able to identify the exact cause yet.
If you have experience with Simscape power systems modeling, transformer and filter configuration, or have encountered similar challenges, I would be grateful for your insights, suggestions, or recommended resources.
0 Commenti
Risposte (1)
Satwik
il 22 Lug 2025
Spostato: Sabin
il 6 Ago 2025
Feel free to share your model file so that the community has a better chance to investigate the issue and provide useful insights.
Meanwhile, here are some resources which might prove useful. These are examples that demonstrate the modelling of electrical and power grids:
I hope this helps!
Vedere anche
Categorie
Scopri di più su Applications in Help Center e File Exchange
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!