I'm a recent user of Simulink. I would like to know whether the simulation stop time 24 is correct to simulate 24 hours (and so the signal in input has to be referred to a day of measurations with time = 24) or I have to indicate 3600s*24 = 86'400 as a simulation stop time (and so the input daily signal has to be created upon 86400s). Thank you for your precious help.
Risposta accettata
Più risposte (1)
mehdi azari
il 25 Feb 2021
1 voto
I want to change the simulation time from seconds to minutes and hours. How should I do this?
2 Commenti
Nasifah Zailan
il 27 Feb 2021
please let me know if you got the answer. thank you.
Basant Ale
il 14 Dic 2022
Did anyone get the answer?