Linear programming for economic dispatch

5 visualizzazioni (ultimi 30 giorni)
Divyesh Patel
Divyesh Patel il 4 Ott 2019
Hi guys, i have this two generator equations and i want to use LINPROG to find the optimal power genion for each unit and get the lambda value given an equality constraint of p1+p2=220MW.
clc; clear all; close all;
load=220;
f=[0.2 3 0.175 3];erat
aeq=[1 1 1 1];
beq=load;
%lb=[0 0]
%ub=[500 0]
[x,fval]=linprog(f,[],[],aeq,beq,[],[])
This is what i have tried but its not working.
Thanks

Risposte (2)

Naveen Venkata Krishnan
Naveen Venkata Krishnan il 10 Ott 2019
Hello Divyesh,
Use Quadprog instead of linear Prog.
is the objective function convert it to form where , to find with respect to . Similiary do the same of .

Thakshala Lakmini
Thakshala Lakmini il 7 Dic 2019
  1. Incremental cost of two power plant units with minimum and maximum power generation between 30MW to 300MW are as follows:
  • Find the economic power dispatch between these units at load 500MW.
  • Verify your answers using matlab. Show the code and the results.

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by