Matlab script is very very slow! Help me please!
Mostra commenti meno recenti
Hello! I am a student and I created a Matlab code that allows me to open many txt files in succession and perform these sums and other operations. The work that the code has to do is a lot but it is really too slow. I calculated that it would take two days to finish. I think there is some conflict. Please ask me to help me otherwise I will have to do all those operations by hand and it will be a disaster for me. Thanks to those who will help me
I enclose the code I wrote in a text file
3 Commenti
Image Analyst
il 26 Dic 2019
Can you also attach 2 or 3 of your text data files so we can at least run the code ourselves? Make it easy for us to help you, not hard.
Rocco De Luca
il 26 Dic 2019
Rocco De Luca
il 26 Dic 2019
Risposte (2)
per isakson
il 26 Dic 2019
Modificato: per isakson
il 26 Dic 2019
Why not just let it run over a weekend?
I've downloaded your files and invoked your script. I interrupted the execution during the fourth data file. The script consists of three nested loops. One statement in the innermost loop uses 90% of the execution time.
for ii = 1 : 512
...
for kk = 1 : 8760 % What about leap years?
...
for jj = 1 : 8760 % What about leap years?
R(ii,[1:5,8:27])=R(ii,[1:5,8:27])+intermedia(jj,[1:5,8,9,11:21,29:35]); % 90%
...
end
end
end
The innermost loop does a number of summations. Replacing the innermost loop by
R(ii,[1:5,8:27]) = sum( intermedia(1:8760,[1:5,8,9,11:21,29:35]), 1 );
is_positive = intermedia(1:8760,7)>0;
R(ii,6) = sum( intermedia(is_positive,7) );
R(ii,7) = sum( intermedia(not(is_positive),7) );
improves the speed of the script significantly. (You need to confirm that it returns the correct result.)
3 Commenti
Rocco De Luca
il 26 Dic 2019
per isakson
il 26 Dic 2019
Did you try the profiler?
I don't think there are more low hanging fruits.
Rocco De Luca
il 26 Dic 2019
Modificato: Rocco De Luca
il 26 Dic 2019
Rocco De Luca
il 27 Dic 2019
0 voti
2 Commenti
per isakson
il 27 Dic 2019
Assume that your original code with the three loops produce the expected result. Use that result as a reference. Each new version shall produce exactly (a floating point error is ok) the same result. That can be tested systematically with the Unit Testing Framework. If the results are identical and if there is enough variation in the data files, COMPLETOA20KM*, the new code is most likely correct. Are the results identical?
Rocco De Luca
il 29 Dic 2019
Categorie
Scopri di più su Environment and Settings in Centro assistenza e File Exchange
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!