SVM - SVMTRAIN method SMO (error: No convergence achieved within maximum number of iterations)

1 visualizzazione (ultimi 30 giorni)
I have been encountered with "No convergence achieved within maximum number of iterations" error. What can I do to fix the error? Please advise me

Risposte (1)

Ilya
Ilya il 27 Lug 2013
You can increase the maximal number of iterations. See 'options' in the doc or help for svmtrain.
  2 Commenti
Ilya
Ilya il 28 Lug 2013
Then do one or all of:
  • lower the box constraint
  • increase tolkkt
  • specify a positive value for kktviolationlevel
  • try a different kernel function

Accedi per commentare.

Categorie

Scopri di più su MATLAB in Help Center e File Exchange

Tag

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by