How can I model a time delay estimator and delay a signal by estimated delay when passed through this algorithm??
5 visualizzazioni (ultimi 30 giorni)
Mostra commenti meno recenti
I'm trying to estimate the time delay as shown in the block below. Basically I have identified my reference mode as Discrete State Space and the Plant with Tau( as another Discrete State Space) and trying to create a time delay estimator in discrete time domain.
Continuous time domain when discretized becomes

Lets say I have xhat[k] and then when this is passed through time delay estimator, it should become xhat[k-tauhat]. For initially, this single step is where I'm stuck. I can't multiply xhat[k] and tauhat[k] - this would be incorrect.
Kindly advise me on this

Risposte (0)
Vedere anche
Categorie
Scopri di più su Online Estimation in Help Center e File Exchange
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!