Contenuto principale

comm.DecisionFeedbackEqualizer

R2026b

Equalize modulated signals using decision feedback filtering

Description

The comm.DecisionFeedbackEqualizer System object™ uses a decision feedback filter tap delay line with a weighted sum to equalize modulated signals transmitted through a dispersive channel. The equalizer object adaptively adjusts tap weights based on the selected algorithm. For more information, see Algorithms.

To equalize modulated signals using a decision feedback filter:

  1. Create the comm.DecisionFeedbackEqualizer object and set its properties.

  2. Call the object with arguments, as if it were a function.

To learn more about how System objects work, see What Are System Objects?

Creation

Description

dfe = comm.DecisionFeedbackEqualizer creates a decision feedback equalizer System object to adaptively equalize a signal.

example

dfe = comm.DecisionFeedbackEqualizer(Name,Value) sets properties using one or more name-value pairs. For example, comm.DecisionFeedbackEqualizer('Algorithm','RLS') configures the equalizer object to update tap weights using the recursive least squares (RLS) algorithm. Enclose each property name in quotes.

example

Properties

expand all

Unless otherwise indicated, properties are nontunable, which means you cannot change their values after calling the object. Objects lock when you call them, and the release function unlocks them.

If a property is tunable, you can change its value at any time.

For more information on changing property values, see System Design in MATLAB Using System Objects.

Adaptive algorithm used for equalization, specified as one of these values:

Data Types: char | string

Number of forward equalizer taps, specified as a positive integer. The number of forward equalizer taps must be greater than or equal to the value of the InputSamplesPerSymbol property.

Data Types: double

Number of feedback equalizer taps, specified as a positive integer.

Data Types: double

Step size used by the adaptive algorithm, specified as a positive scalar. Increasing the step size reduces the equalizer convergence time but causes the equalizer output estimates to be less stable.

Tip

To determine the maximum step size allowed, use the maxstep object function.

Tunable: Yes

Dependencies

To enable this property, set Algorithm to 'LMS' or 'CMA'.

Data Types: double

Forgetting factor used by the adaptive algorithm, specified as a scalar in the range (0, 1]. Decreasing the forgetting factor reduces the equalizer convergence time but causes the equalizer output estimates to be less stable.

Tunable: Yes

Dependencies

To enable this property, set Algorithm to 'RLS'.

Data Types: double

Initial inverse correlation matrix, specified as a scalar or an NTaps-by-NTaps matrix. NTaps is equal to the sum of the NumForwardTaps and NumFeedbackTaps property values. If you specify InitialInverseCorrelationMatrix as a scalar, a, the equalizer sets the initial inverse correlation matrix to a times the identity matrix: a(eye(NTaps)).

Dependencies

To enable this property, set Algorithm to 'RLS'.

Data Types: double

Signal constellation, specified as a vector. The default value is a QPSK constellation generated using this code: pskmod(0:3,4,pi/4).

Data Types: double

Reference tap, specified as a positive integer less than or equal to the NumForwardTaps property value. The equalizer uses the reference tap location to track the main energy of the channel.

Data Types: double

Input signal delay in samples relative to the reset time of the equalizer, specified as a nonnegative integer. If the input signal is a vector of length greater than 1, then the input delay is relative to the start of the input vector. If the input signal is a scalar, then the input delay is relative to the first call of the System object and to the first call of the System object after calling the release or reset object function.

Data Types: double

Number of input samples per symbol, specified as a positive integer. Setting this property to any number greater than one effectively creates a fractionally spaced equalizer.

Data Types: double

Enable training control input, specified as a logical 0 (false) or 1 (true). Setting this property to true enables the equalizer training flag input tf.

Data Types: logical

Update tap weights when not training, specified as a logical 1 (true) or 0 (false). If this property is set to true, the System object uses decision directed mode to update equalizer tap weights. If this property is set to false, the System object keeps the equalizer tap weights unchanged after training.

Data Types: logical

Source of adapt tap weights request, specified as one of these values:

  • 'Property' — Specify this value to use the AdaptWeights property to control when the System object adapts tap weights.

  • 'Input port' — Specify this value to use the aw input to control when the System object adapts tap weights.

Dependencies

To enable this property, set Algorithm to 'CMA'.

Data Types: char | string

Adapt tap weights, specified as a logical 1 (true) or 0 (false). If this property is set to true, the System object updates the equalizer tap weights. If this property is set to false, the System object keeps the equalizer tap weights unchanged.

Dependencies

To enable this property, set AdaptWeightsSource to 'Property' and set AdaptAfterTraining to true.

Data Types: logical

Source for initial tap weights, specified as one of these values:

  • 'Auto' — Initialize the tap weights to the algorithm-specific default values, as described in the InitialWeights property.

  • 'Property' — Initialize the tap weights using the InitialWeights property value.

Data Types: char | string

Initial weights used by the adaptive algorithm, specified as a scalar or vector. The default is 0 when the Algorithm property is set to 'LMS' or 'RLS'. The default is [0;0;1;0;0] when the Algorithm property is set to 'CMA'.

If you specify InitialWeights as a scalar, the equalizer uses scalar expansion to create a vector of length NTaps with all values set to InitialWeights. NTaps is equal to the sum of the NumForwardTaps and NumFeedbackTaps property values. If you specify InitialWeights as a vector, the vector length must be NTaps.

Data Types: double

Tap weight update period in symbols, specified as a positive integer. The equalizer updates the tap weights after processing this number of symbols.

Data Types: double

Usage

Description

Y = dfe(X,tsym) equalizes input signal X by using training symbols tsym. The output is the equalized symbols. To enable this syntax, set the Algorithm property to 'LMS' or 'RLS'.

example

Y = dfe(X,tsym,tf) also specifies training flag tf. The System object starts training when tf changes from false to true (at the rising edge). The System object trains until all symbols in tsym are processed. The input tsym is ignored when tf is false. To enable this syntax, set the Algorithm property to 'LMS' or 'RLS' and TrainingFlagInputPort property to true.

example

Y = dfe(X) equalizes input signal X. To enable this syntax, set the Algorithm property to 'CMA'.

Y = dfe(X,aw) also specifies adapts weights flag aw. If aw is true, the System object adapts the equalizer tap weights. If aw is false, the System object keeps the weights unchanged. To enable this syntax, set the Algorithm property to 'CMA' and AdaptWeightsSource property to 'Input port'.

example

[Y,err] = dfe(___) also returns error signal err using input arguments from any of the previous syntaxes.

[Y,err,weights] = dfe(___) also returns weights, the tap weights from the last tap weight update, using input arguments from any of the previous syntaxes.

example

Input Arguments

expand all

Input signal, specified as a column vector. The input signal vector length must be equal to an integer multiple of the InputSamplesPerSymbol property value. For more information, see Symbol Tap Spacing.

This object accepts variable-size inputs. After the object is locked, you can change the frame size (number of rows) of the signal during simulation but the number of channels (columns) must remain constant. For more information, see Variable-Size Signals in Code.

Data Types: double
Complex Number Support: Yes

Training symbols, specified as a column vector of length less than or equal to the length of input X. The input tsym is ignored when tf is false.

Dependencies

To enable this argument, set the Algorithm property to 'LMS' or 'RLS'.

Data Types: double

Training flag, specified as a logical 1 (true) or 0 (false). The System object starts training when tf changes from false to true (at the rising edge). The System object trains until all symbols in tsym are processed. The input tsym is ignored when tf is false.

Dependencies

To enable this argument, set the Algorithm property to 'LMS' or 'RLS' and TrainingFlagInputPort property to true.

Data Types: logical

Adapt weights flag, specified as a logical 1 (true) or 0 (false). If aw is true, the System object adapts weights. If aw is false, the System object keeps the weights unchanged.

Dependencies

To enable this argument, set the Algorithm property to 'CMA' and AdaptWeightsSource property to 'Input port'.

Data Types: logical

Output Arguments

expand all

Equalized symbols, returned as a column vector that has the same length as input signal X.

Error signal, returned as a column vector that has the same length as input signal X.

Tap weights, returned as a column vector that has NTaps elements. NTaps is equal to the sum of the NumForwardTaps and NumFeedbackTaps property values. weights contains the tap weights from the last tap weight update.

Object Functions

To use an object function, specify the System object as the first input argument. For example, to release system resources of a System object named obj, use this syntax:

release(obj)

expand all

isLockedDetermine if System object is in use
cloneCreate duplicate System object
infoCharacteristic information about the equalizer object
maxstepMaximum step size for LMS equalizer convergence
mmseweightsLinear equalizer MMSE tap weights
stepRun System object algorithm
releaseRelease resources and allow changes to System object property values and input characteristics
resetReset internal states of System object

Examples

collapse all

Create an equalizer System object™, specifying a decision feedback LMS equalizer having eight forward taps, five feedback taps, a step size of 0.03, and expecting a BPSK signal constellation.

M = 2; % Modulation order
eqdfe_lms = comm.DecisionFeedbackEqualizer(Algorithm='LMS', ...
    NumForwardTaps=8,NumFeedbackTaps=5,StepSize=0.03, ...
    Constellation=pskmod(0:M-1,M));

Change the reference tap index of the equalizer.

eqdfe_lms.ReferenceTap = 4;

Build a set of test data. Receive the data by convolving the signal.

x = pskmod(randi([0 M-1],1000,1),M);
rxsig = conv(x,[1; 0.8; 0.3]);

Use maxstep to display the maximum permitted step size.

mxStep = maxstep(eqdfe_lms,rxsig)
mxStep = 
0.1028

Equalize the received signal. Use the first 200 symbols as the training sequence.

y = eqdfe_lms(rxsig,x(1:200));

Apply decision feedback equalization using the least mean squares (LMS) algorithm to recover QPSK symbols passed through a delayed multipath AWGN channel.

Initialize simulation variables.

M = 4; % QPSK
numSymbols = 10000;
numTrainingSymbols = 1000;
chtaps = [1 0.5*exp(1i*pi/6) 0.1*exp(-1i*pi/8)];

Generate QPSK-modulated symbols. Apply delayed multipath channel filtering and AWGN impairments to the symbols.

data = randi([0 M-1], numSymbols, 1);
tx = pskmod(data, M, pi/4);
rx = awgn(filter(chtaps,1,tx),25,'measured');

Create a decision feedback equalizer System object and display the default configuration. Adjust the reference tap to 1. Check the maximum permitted step size. Equalize the impaired symbols.

eq = comm.DecisionFeedbackEqualizer
eq = 
  comm.DecisionFeedbackEqualizer with properties:

                Algorithm: 'LMS'
           NumForwardTaps: 5
          NumFeedbackTaps: 3
                 StepSize: 0.0100
            Constellation: [0.7071 + 0.7071i -0.7071 + 0.7071i -0.7071 - 0.7071i 0.7071 - 0.7071i]
             ReferenceTap: 3
               InputDelay: 0
    InputSamplesPerSymbol: 1
    TrainingFlagInputPort: false
       AdaptAfterTraining: true
     InitialWeightsSource: 'Auto'
       WeightUpdatePeriod: 1

eq.ReferenceTap = 1;

mxStep = maxstep(eq,rx)
mxStep = 
0.2149
[y,err,weights] = eq(rx,tx(1:numTrainingSymbols));

Plot the constellation of the impaired and equalized symbols.

constell = comm.ConstellationDiagram('NumInputPorts',2);
constell(rx,y)

Plot the equalizer error signal and compute the error vector magnitude of the equalized symbols.

plot(abs(err))
grid on; xlabel('Symbols'); ylabel('|e|')

Figure contains an axes object. The axes object with xlabel Symbols, ylabel |e| contains an object of type line.

errevm = comm.EVM;
evm = errevm(tx,y)
evm = 
10.1268

Plot the equalizer tap weights.

subplot(3,1,1);
stem(real(weights));
ylabel('real(weights)');
xlabel('Tap');
grid on;
axis([1 8 -0.5 1])
line([eq.NumForwardTaps+0.5 eq.NumForwardTaps+0.5], ...
    [-0.5 1],'Color','r','LineWidth',1)
title('Equalizer Tap Weights')
subplot(3,1,2);
stem(imag(weights));
ylabel('imag(weights)');
xlabel('Tap');
grid on;
axis([1 8 -0.5 1])
line([eq.NumForwardTaps+0.5 eq.NumForwardTaps+0.5], ...
    [-0.5 1],'Color','r','LineWidth',1)
subplot(3,1,3);
stem(abs(weights));
ylabel('abs(weights)');
xlabel('Tap');
grid on;
axis([1 8 -0.5 1])
line([eq.NumForwardTaps+0.5 eq.NumForwardTaps+0.5], ...
    [-0.5 1],'Color','r','LineWidth',1)

Figure contains 3 axes objects. Axes object 1 with title Equalizer Tap Weights, xlabel Tap, ylabel real(weights) contains 2 objects of type stem, line. Axes object 2 with xlabel Tap, ylabel imag(weights) contains 2 objects of type stem, line. Axes object 3 with xlabel Tap, ylabel abs(weights) contains 2 objects of type stem, line.

Demonstrate decision feedback equalization using the least mean squares (LMS) algorithm to recover QPSK symbols passed through an AWGN channel. Apply different equalizer training schemes and show the symbol error magnitude.

System Setup

Simulate a QPSK-modulated system subject to AWGN. Transmit packets composed of 200 training symbols and 1800 random data symbols. Configure a decision feedback LMS equalizer to recover the packet data.

M = 4;
numTrainSymbols = 200;
numDataSymbols = 1800;
SNR = 20;
trainingSymbols = ...
    pskmod(randi([0 M-1],numTrainSymbols,1),M,pi/4);
numPkts = 10;
dfeq = comm.DecisionFeedbackEqualizer( ...
    Algorithm="LMS", ...
    NumForwardTaps=5, ...
    NumFeedbackTaps=4, ...
    ReferenceTap=3, ...
    StepSize=0.01);

Train the Equalizer at the Beginning of Each Packet with Reset

Process each packet using prepended training symbols. Reset the equalizer after processing each packet. Resetting the equalizer after each packet forces the equalizer to train taps with no a priori knowledge. Equalizer error signal plots for the first, second, and last packet show higher symbol errors at the start of each packet.

jj = 1;
figure
for ii = 1:numPkts
    b = randi([0 M-1],numDataSymbols,1);
    dataSym = pskmod(b,M,pi/4);
    packet = [trainingSymbols;dataSym];
    rx = awgn(packet,SNR);
    [~,err] = dfeq(rx,trainingSymbols);
    reset(dfeq)
    if (ii ==1 || ii == 2 ||ii == numPkts)
        subplot(3,1,jj)
        plot(abs(err))
        ylim([0 1])
        title(['Packet # ',num2str(ii)])
        xlabel('Symbols');
        ylabel('Error Magnitude');
        grid on;
        jj = jj+1;
    end
end

Figure contains 3 axes objects. Axes object 1 with title Packet # 1, xlabel Symbols, ylabel Error Magnitude contains an object of type line. Axes object 2 with title Packet # 2, xlabel Symbols, ylabel Error Magnitude contains an object of type line. Axes object 3 with title Packet # 10, xlabel Symbols, ylabel Error Magnitude contains an object of type line.

Train the Equalizer at the Beginning of Each Packet Without Reset

Process each packet using prepended training symbols. Do not reset the equalizer after each packet is processed. By not resetting after each packet, the equalizer retains tap weights from training prior packets. Equalizer error signal plots for the first, second, and last packet show that after the initial training on the first packet, subsequent packets have less symbol errors at the start of each packet.

release(dfeq)
jj = 1;
figure
for ii = 1:numPkts
    b = randi([0 M-1],numDataSymbols,1);
    dataSym = pskmod(b,M,pi/4);
    packet = [trainingSymbols;dataSym];
    channel = 1;
    rx = awgn(packet*channel,SNR);
    [~,err] = dfeq(rx,trainingSymbols);
    if (ii ==1 || ii == 2 ||ii == numPkts)
        subplot(3,1,jj)
        plot(abs(err))
        ylim([0 1])
        title(['Packet # ',num2str(ii)])
        xlabel('Symbols');
        ylabel('Error Magnitude');
        grid on;
        jj = jj+1;
    end
end

Figure contains 3 axes objects. Axes object 1 with title Packet # 1, xlabel Symbols, ylabel Error Magnitude contains an object of type line. Axes object 2 with title Packet # 2, xlabel Symbols, ylabel Error Magnitude contains an object of type line. Axes object 3 with title Packet # 10, xlabel Symbols, ylabel Error Magnitude contains an object of type line.

Train the Equalizer Periodically

Systems with signals subject to time-varying channels require periodic equalizer training to maintain lock on the channel variations. Specify a system that has 200 symbols of training for every 1800 data symbols. Between training, the equalizer does not update tap weights. The equalizer processes 200 symbols per packet.

Rs = 1e6;
fd = 20;
spp = 200; % Symbols per packet
b = randi([0 M-1],numDataSymbols,1);
dataSym = pskmod(b,M,pi/4);
packet = [trainingSymbols; dataSym];
stream = repmat(packet,10,1);
tx = (0:length(stream)-1)'/Rs;
channel = exp(1i*2*pi*fd*tx);
rx = awgn(stream.*channel,SNR);

Set the AdaptAfterTraining property to false to stop the equalizer tap weight updates after the training phase.

release(dfeq)
dfeq.AdaptAfterTraining = false
dfeq = 
  comm.DecisionFeedbackEqualizer with properties:

                Algorithm: 'LMS'
           NumForwardTaps: 5
          NumFeedbackTaps: 4
                 StepSize: 0.0100
            Constellation: [0.7071 + 0.7071i -0.7071 + 0.7071i -0.7071 - 0.7071i 0.7071 - 0.7071i]
             ReferenceTap: 3
               InputDelay: 0
    InputSamplesPerSymbol: 1
    TrainingFlagInputPort: false
       AdaptAfterTraining: false
     InitialWeightsSource: 'Auto'
       WeightUpdatePeriod: 1

Equalize the impaired data. Plot the angular error from the channel, the equalizer error signal, and signal constellation. As the channel varies, the equalizer output does not remove the channel effects. Also, the output constellation rotates out of sync, resulting in bit errors.

[y,err] = dfeq(rx,trainingSymbols);

figure
subplot(2,1,1)
plot(tx, unwrap(angle(channel)))
xlabel('Time (sec)')
ylabel('Channel Angle (rad)')
title('Angular Error Over Time')
subplot(2,1,2)
plot(abs(err))
xlabel('Symbols')
ylabel('Error Magnitude')
grid on
title('Time-Varying Channel Without Retraining')

Figure contains 2 axes objects. Axes object 1 with title Angular Error Over Time, xlabel Time (sec), ylabel Channel Angle (rad) contains an object of type line. Axes object 2 with title Time-Varying Channel Without Retraining, xlabel Symbols, ylabel Error Magnitude contains an object of type line.

scatterplot(y)

Figure Scatter Plot contains an axes object. The axes object with title Scatter Plot, xlabel In-Phase, ylabel Quadrature contains a line object which displays its values using only markers.

Set the TrainingInputPort property to true to configure the equalizer to retrain the taps when signaled by the trainFlag input. The equalizer trains only when trainFlag is true. After every 2000 symbols, the equalizer retrains the taps and keeps lock on variations of the channel. Plot the angular error from the channel, the equalizer error signal, and signal constellation. As the channel varies, the equalizer output removes the channel effects. Also, the output constellation does not rotate out of sync, and bit errors are reduced.

release(dfeq)
dfeq.TrainingFlagInputPort = true;
symbolCnt = 0;
numPackets = length(rx)/spp;
trainFlag = true;
trainingPeriod = 2000;
eVec = zeros(size(rx));
yVec = zeros(size(rx));
for p=1:numPackets
    [yVec((p-1)*spp+1:p*spp,1),eVec((p-1)*spp+1:p*spp,1)] = ...
        dfeq(rx((p-1)*spp+1:p*spp,1), ...
        trainingSymbols,trainFlag);
    symbolCnt = symbolCnt + spp;
    if symbolCnt >= trainingPeriod
        trainFlag = true;
        symbolCnt = 0;
    else
        trainFlag = false;
    end
end
figure
subplot(2,1,1)
plot(tx, unwrap(angle(channel)))
xlabel('t (sec)')
ylabel('Channel Angle (rad)')
title('Angular Error Over Time')
subplot(2,1,2)
plot(abs(eVec))
xlabel('Symbols')
ylabel('Error Magnitude')
grid on
title('Time-Varying Channel With Retraining')

Figure contains 2 axes objects. Axes object 1 with title Angular Error Over Time, xlabel t (sec), ylabel Channel Angle (rad) contains an object of type line. Axes object 2 with title Time-Varying Channel With Retraining, xlabel Symbols, ylabel Error Magnitude contains an object of type line.

scatterplot(yVec)

Figure Scatter Plot contains an axes object. The axes object with title Scatter Plot, xlabel In-Phase, ylabel Quadrature contains a line object which displays its values using only markers.

Simulate a system with delay between the transmitted symbols and received samples. Typical systems have transmitter and receiver filters that result in a delay. This delay must be accounted for to synchronize the system. In this example, the system delay is introduced without transmit and receive filters. Decision feedback equalization, using the least mean squares (LMS) algorithm, recovers QPSK symbols.

Initialize simulation variables.

M = 4; % QPSK
numSymbols = 10000;
numTrainingSymbols = 1000;
mpChan = [1 0.5*exp(1i*pi/6) 0.1*exp(-1i*pi/8)];
systemDelay = dsp.Delay(20);
snr = 24;

Generate QPSK-modulated symbols. Apply multipath channel filtering, a system delay, and AWGN to the transmitted symbols.

data = randi([0 M-1],numSymbols,1);
tx = pskmod(data,M,pi/4); % OQPSK
delayedSym = systemDelay(filter(mpChan,1,tx));
rx = awgn(delayedSym,snr,'measured');

Create equalizer and EVM System objects. The equalizer System object specifies a decision feedback equalizer using the LMS algorithm.

dfeq = comm.DecisionFeedbackEqualizer('Algorithm','LMS', ...
    'NumForwardTaps',9,'NumFeedbackTaps',6,'ReferenceTap',5);
evm = comm.EVM('ReferenceSignalSource', ...
    'Estimated from reference constellation');

Equalize Without Adjusting Input Delay

Equalize the received symbols.

[y1,err1,wts1] = dfeq(rx,tx(1:numTrainingSymbols,1));

Find the delay between the received symbols and the transmitted symbols by using the finddelay function.

rxDelay = finddelay(tx,rx)
rxDelay = 
20

Display the equalizer information. The latency value indicates the delay introduced by the equalizer. Calculate the total delay as the sum of rxDelay and the equalizer latency.

eqInfo = info(dfeq)
eqInfo = struct with fields:
    Latency: 4

totalDelay = rxDelay + eqInfo.Latency;

Until the equalizer output converges, the symbol error rate is high. Plot the error output, err1, to determine when the equalized output converges.

plot(abs(err1))
xlabel('Symbols')
ylabel('Error Magnitude')
title('Equalizer Error Signal')

Figure contains an axes object. The axes object with title Equalizer Error Signal, xlabel Symbols, ylabel Error Magnitude contains an object of type line.

The plot shows excessive errors for the first 2000 symbols. When demodulating symbols and computing symbol errors, account for the unconverged output and the system delay between the equalizer output and transmitted symbols.

dataRec1 = pskdemod(y1(2000+totalDelay:end),M,pi/4);
symErrWithDelay = symerr(data(2000:end-totalDelay),dataRec1)
symErrWithDelay = 
5977
evmWithDelay = evm(y1)
evmWithDelay = 
26.3382

The error rate and EVM are high because the receive delay was not accounted for in the equalizer System object.

Adjust Input Delay in Decision Feedback Equalizer

Equalize the received data by using the delay value to set the InputDelay property. Since InputDelay is a nontunable property, you must release the dfeq System object to reconfigure the InputDelay property. Equalize the received symbols.

release(dfeq)
dfeq.InputDelay = rxDelay
dfeq = 
  comm.DecisionFeedbackEqualizer with properties:

                Algorithm: 'LMS'
           NumForwardTaps: 9
          NumFeedbackTaps: 6
                 StepSize: 0.0100
            Constellation: [0.7071 + 0.7071i -0.7071 + 0.7071i -0.7071 - 0.7071i 0.7071 - 0.7071i]
             ReferenceTap: 5
               InputDelay: 20
    InputSamplesPerSymbol: 1
    TrainingFlagInputPort: false
       AdaptAfterTraining: true
     InitialWeightsSource: 'Auto'
       WeightUpdatePeriod: 1

[y2,err2,wts2] = dfeq(rx,tx(1:numTrainingSymbols,1));

Plot the tap weights and equalized error magnitude. A stem plot shows the equalizer tap weights before and after the system delay is removed. A 2-D line plot shows the slower equalizer convergence for the delayed signal, as compared to the signal with the delay removed.

subplot(2,1,1)
stem([real(wts1),real(wts2)])
xlabel('Taps')
ylabel('Tap Weight Real')
legend('rxDelayed','rxDelayRemoved')
grid on
subplot(2,1,2)
stem([imag(wts1),imag(wts2)])
xlabel('Taps')
ylabel('Tap Weight Imaginary')
legend('rxDelayed','rxDelayRemoved')
grid on

Figure contains 2 axes objects. Axes object 1 with xlabel Taps, ylabel Tap Weight Real contains 2 objects of type stem. These objects represent rxDelayed, rxDelayRemoved. Axes object 2 with xlabel Taps, ylabel Tap Weight Imaginary contains 2 objects of type stem. These objects represent rxDelayed, rxDelayRemoved.

figure
plot([abs(err1),abs(err2)])
xlabel('Symbols')
ylabel('Error Magnitude')
legend('rxDelayed','rxDelayRemoved')
grid on

Figure contains an axes object. The axes object with xlabel Symbols, ylabel Error Magnitude contains 2 objects of type line. These objects represent rxDelayed, rxDelayRemoved.

Plot error output of the equalized signals, rxDelayed and rxDelayRemoved. For the signal that has the delay removed, the equalizer converges during the 1000 symbol training period. When demodulating symbols and computing symbol errors, to account for the unconverged output and the system delay between the equalizer output and transmitted symbols, skip the first 500 symbols. Reconfiguring the equalizer to account for the system delay enables better equalization of the signal, and reduces symbol errors and the EVM.

eqInfo = info(dfeq)
eqInfo = struct with fields:
    Latency: 4

totalDelay = rxDelay + eqInfo.Latency;
dataRec2 = pskdemod(y2(500+totalDelay:end),M,pi/4);
symErrDelayRemoved = symerr(data(500:end-totalDelay),dataRec2)
symErrDelayRemoved = 
0
evmDelayRemoved = evm(y2(500+totalDelay:end))
evmDelayRemoved = 
7.5357

Recover QPSK symbols with a decision equalizer, using the constant modulus algorithm (CMA) and EVM-based taps training. When using blind equalizer algorithms, such as CMA, you can train the equalizer taps using the AdaptWeights property to start and stop training. Use helper functions to generate plots and apply phase correction.

Initialize system variables.

rng(123456);
M = 4; % QPSK
numSymbols = 100;
numPackets = 5000;
refTap = 3;
nFwdTaps = 5;
nFdbkTaps = 4;
ttlTaps = nFwdTaps + nFdbkTaps;
raylChan = comm.RayleighChannel( ...
    'PathDelays',[0 1], ...
    'AveragePathGains',[0 -12], ...
    'MaximumDopplerShift',1e-5);
SNR = 50;
adaptWeights = true;

Create the equalizer and EVM System objects. The equalizer System object specifies a decision feedback equalizer using the CMA adaptive algorithm. Call the helper function to initialize figure plots.

dfeq = comm.DecisionFeedbackEqualizer( ...
    'Algorithm','CMA', ...
    'NumForwardTaps',nFwdTaps, ...
    'NumFeedbackTaps',nFdbkTaps, ...
    'ReferenceTap',refTap, ...
    'StepSize',0.03, ...
    'AdaptWeightsSource','Input port')
dfeq = 
  comm.DecisionFeedbackEqualizer with properties:

                Algorithm: 'CMA'
           NumForwardTaps: 5
          NumFeedbackTaps: 4
                 StepSize: 0.0300
            Constellation: [0.7071 + 0.7071i -0.7071 + 0.7071i -0.7071 - 0.7071i 0.7071 - 0.7071i]
             ReferenceTap: 3
    InputSamplesPerSymbol: 1
       AdaptWeightsSource: 'Input port'
     InitialWeightsSource: 'Auto'
       WeightUpdatePeriod: 1

info(dfeq)
ans = struct with fields:
    Latency: 2

evm = comm.EVM('ReferenceSignalSource', ...
    'Estimated from reference constellation');
[errPlot,evmPlot,scatSym,adaptState] = ...
    initFigures(numPackets,ttlTaps);

Equalization Loop

Follow these steps to implement the equalization loop.

  1. Generate OQPSK data packets.

  2. Apply Rayleigh fading and AWGN to the transmission data.

  3. Apply equalization to the received data and phase correction to the equalizer output.

  4. Estimate the EVM and toggle the adaptWeights flag to true or false based on the EVM level.

  5. Update the figure plots.

for p=1:numPackets
    data = randi([0 M-1],numSymbols,1);
    tx = pskmod(data,M,pi/4);
    rx = awgn(raylChan(tx),SNR);
    rxDelay = finddelay(rx,tx);
    [y,err,wts] = dfeq(rx,adaptWeights);
    y = phaseCorrection(y);
    evmEst = evm(y);
    adaptWeights = (evmEst > 20);
    
    updateFigures(errPlot,evmPlot,scatSym,adaptState, ...
        wts,y(end),evmEst,adaptWeights,p,numPackets)
end

Figure contains 4 axes objects. Axes object 1 with title Tap Weight Magnitude, xlabel Taps, ylabel |Weights| contains an object of type stem. Axes object 2 with title Scatter Plot, xlabel In-phase, ylabel Quadrature contains a line object which displays its values using only markers. Axes object 3 with title Adapt Weights Signal, xlabel Symbols, ylabel Training contains an object of type line. Axes object 4 with title EVM, xlabel Symbols, ylabel EVM (%) contains an object of type line.

rxDelay
rxDelay = 
0

The figure plots show that, as the EVM varies, the equalizer toggles in and out of decision-directed weight adaptation mode.

Helper Functions

This helper function initializes figures that show a quad plot of simulation results.

function [errPlot,evmPlot,scatter,adaptState] = ...
    initFigures(numPkts,ttlTaps)
yVec = nan(numPkts,1);
evmVec = nan(numPkts,1);
wVec = zeros(ttlTaps,1);
adaptVec = nan(numPkts,1);

figure
subplot(2,2,1)
evmPlot = stem(wVec);
grid on; axis([1 ttlTaps 0 1.8])
xlabel('Taps');
ylabel('|Weights|');
title('Tap Weight Magnitude')

subplot(2,2,2)
scatter = plot(yVec, '.');
axis square;
axis([-1.2 1.2 -1.2 1.2]);
grid on;
xlabel('In-phase');
ylabel('Quadrature');
title('Scatter Plot');
subplot(2,2,3)
adaptState = plot(adaptVec);
grid on;
axis([0 numPkts -0.2 1.2])
ylabel('Training');
xlabel('Symbols');
title('Adapt Weights Signal')
subplot(2,2,4)
errPlot = plot(evmVec);
grid on;
axis([1 numPkts 0 100])
xlabel('Symbols');
ylabel('EVM (%)');
title('EVM')
end

This helper function updates the figures.

function updateFigures(errPlot,evmPlot,scatSym, ...
    adaptState,w,y,evmEst,adaptWts,p,numFrames)
persistent yVec evmVec adaptVec

if p == 1
    yVec = nan(numFrames,1);
    evmVec = nan(numFrames,1);
    adaptVec = nan(numFrames,1);
end

yVec(p) = y;
evmVec(p) = evmEst;
adaptVec(p) = adaptWts;

errPlot.YData = abs(evmVec);
evmPlot.YData = abs(w);
scatSym.XData = real(yVec);
scatSym.YData = imag(yVec);
adaptState.YData = adaptVec;
drawnow limitrate
end

This helper function applies phase correction.

function y = phaseCorrection(y)
a = angle(y((real(y) > 0) & (imag(y) > 0)));
a(a < 0.1) = a(a < 0.1) + pi/2;
theta = mean(a) - pi/4;
y = y * exp(-1i*theta);
end

Recover QPSK symbols in fading environments with a decision feedback equalizer, using the least mean squares (LMS) algorithm. Use the reset object function to equalize independent packets. Use helper functions to generate plots. This example also shows symbol-based processing and frame-based processing.

Setup

Initialize system variables, create the equalizer System object, and initialize the plot figures.

M = 4; % QPSK
numSym = 1000;
numTrainingSym = 100;
numPackets = 5;
refTap = 5;
nFwdTaps = 9;
nFdbkTaps = 4;
ttlTaps = nFwdTaps + nFdbkTaps;
stepsz = 0.01;
ttlNumSym = numSym + numTrainingSym;
raylChan = comm.RayleighChannel( ...
    'PathDelays',[0 1], ...
    'AveragePathGains',[0 -9], ...
    'MaximumDopplerShift',0, ...
    'PathGainsOutputPort',true);
SNR = 35;
rxVec = zeros(ttlNumSym,numPackets);
txVec = zeros(ttlNumSym,numPackets);
yVec = zeros(ttlNumSym,1);
eVec = zeros(ttlNumSym,1);

dfeq1 = comm.DecisionFeedbackEqualizer( ...
    'Algorithm','LMS', ...
    'NumForwardTaps',nFwdTaps, ...
    'NumFeedbackTaps',nFdbkTaps, ...
    'ReferenceTap',refTap, ...
    'StepSize',stepsz, ...
    'TrainingFlagInputPort',true);

[errPlot,wStem,hStem,scatPlot] = ...
    initFigures(ttlNumSym,ttlTaps, ...
    raylChan.AveragePathGains);

Symbol-Based Processing

For symbol-based processing, provide one symbol at the input of the equalizer. Reset the equalizer state and channel after processing each packet.

for p = 1:numPackets
    trainingFlag = true;
    for q=1:ttlNumSym
        data = randi([0 M-1],1,1);
        tx = pskmod(data,M,pi/4);
        [xc,pg] = raylChan(tx);
        rx = awgn(xc,25);
        [y,err,wts] = dfeq1(rx,tx,trainingFlag);

Disable training after processing numTrainingSym training symbols.

        if q == numTrainingSym
            trainingFlag = false;
        end
        updateFigures(errPlot,wStem,hStem, ...
            scatPlot,err,wts,y,pg,q,ttlNumSym);
        txVec(q,p) = tx;
        rxVec(q,p) = rx;
    end

After processing each packet, reset the channel System object to get a new realization of channel taps and the equalizer System object to restore the default taps weights.

    reset(raylChan)
    reset(dfeq1)
end

Figure contains 4 axes objects. Axes object 1 with title Tap Weight Magnitude, xlabel Taps, ylabel |Weights| contains an object of type stem. Axes object 2 with title Channel Path Gain Magnitude, xlabel Taps, ylabel |Path Gain| contains an object of type stem. Axes object 3 with title Error Magnitude, xlabel Symbols, ylabel |Error Magnitude| contains an object of type line. Axes object 4 with title Scatter Plot, xlabel In-phase, ylabel Quadrature contains a line object which displays its values using only markers.

Packet-Based Processing

For packet-based processing, provide one packet at the input of the equalizer. Each packet contains ttlNumSym symbols. Because the training duration is less than the packet length, you do not need to specify the start-training input.

yVecPkt = zeros(ttlNumSym,numPackets);
errVecPkt = zeros(ttlNumSym,numPackets);
wgtVecPkt = zeros(ttlTaps,numPackets);
dfeq2 = comm.DecisionFeedbackEqualizer( ...
    'Algorithm','LMS', ...
    'NumForwardTaps',nFwdTaps, ...
    'NumFeedbackTaps',nFdbkTaps, ...
    'ReferenceTap',refTap, ...
    'StepSize',stepsz);
for p = 1:numPackets
    [yVecPkt(:,p),errVecPkt(:,p),wgtVecPkt(:,p)] = ...
        dfeq2(rxVec(:,p),txVec(1:numTrainingSym,p));
    for q=1:ttlNumSym
        updateFigures(errPlot,wStem,hStem,scatPlot, ...
            errVecPkt(q,p),wgtVecPkt(:,p),yVecPkt(q,p), ...
            pg,q,ttlNumSym);
    end

After processing each packet, reset the channel System object to get a new realization of channel taps and the equalizer System object to restore the default taps weights.

    reset(raylChan)
    reset(dfeq2)
end

Figure contains 4 axes objects. Axes object 1 with title Tap Weight Magnitude, xlabel Taps, ylabel |Weights| contains an object of type stem. Axes object 2 with title Channel Path Gain Magnitude, xlabel Taps, ylabel |Path Gain| contains an object of type stem. Axes object 3 with title Error Magnitude, xlabel Symbols, ylabel |Error Magnitude| contains an object of type line. Axes object 4 with title Scatter Plot, xlabel In-phase, ylabel Quadrature contains a line object which displays its values using only markers.

Helper Functions

This helper function initializes the figures.

function [errPlot,wStem,hStem,scatPlot] = ...
    initFigures(ttlNumSym,ttlTap,pg)
yVec = nan(ttlNumSym,1);
eVec = nan(ttlNumSym,1);
wVec = zeros(ttlTap,1);
figure;
subplot(2,2,1);
wStem = stem(wVec);
axis([1 ttlTap 0 1.8]);
grid on;
xlabel('Taps');
ylabel('|Weights|');
title('Tap Weight Magnitude')
subplot(2,2,2);
hStem = stem([0 abs(pg) 0]);
grid on;
xlabel('Taps');
ylabel('|Path Gain|');
title('Channel Path Gain Magnitude')
subplot(2,2,3);
errPlot = plot(eVec);
axis([1 ttlNumSym 0 1.2]);
grid on
xlabel('Symbols');
ylabel('|Error Magnitude|');
title('Error Magnitude')
subplot(2,2,4);
scatPlot = plot(yVec,'.');
axis square;
axis([-1.2 1.2 -1.2 1.2]);
grid on;
xlabel('In-phase');
ylabel('Quadrature');
title(sprintf('Scatter Plot'));
end

This helper function updates the figures.

function updateFigures(errPlot,wStem,hStem,scatPlot, ...
    err,wts,y,pg,p,ttlNumSym)
persistent yVec eVec
if p == 1
    yVec = nan(ttlNumSym,1);
    eVec = nan(ttlNumSym,1);
end
yVec(p) = y;
eVec(p) = abs(err);
errPlot.YData = abs(eVec);
wStem.YData = abs(wts);
hStem.YData = [0 abs(pg) 0];
scatPlot.XData = real(yVec);
scatPlot.YData = imag(yVec);
drawnow limitrate
end

More About

expand all

Algorithms

expand all

Extended Capabilities

expand all

C/C++ Code Generation
Generate C and C++ code using MATLAB® Coder™.

GPU Code Generation
Generate CUDA® code for NVIDIA® GPUs using GPU Coder™.

Version History

Introduced in R2019a