Azzera filtri
Azzera filtri

I want to model 100KVA load operating at 0.9 power factor lagging. What should i set Active Power, QL and QC in load parameters?

3 visualizzazioni (ultimi 30 giorni)
Hi,
Please help me find the answer to this question:
I want to model 100KVA load operating at 0.9 power factor lagging. What should i set Active Power, QL and QC in load parameters?

Risposta accettata

Pemendra Kumar Pardhi
Pemendra Kumar Pardhi il 29 Set 2020
as per your requirement
Apparent power S= √(P^2+Q^2 ).....................................(1)
And power factor Cosφ= 0.9 lagging, i.e. only inductive load(QL=.. and Qc=0);
Where ϕ= tan^-1(Q/P),.....................................................(2)
from Eq. 1 and 2 you can obtained value of P and QL

Più risposte (0)

Community

Più risposte nel  Power Electronics Control

Categorie

Scopri di più su Simulink Control Design in Help Center e File Exchange

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by